Weeks 29 & 30 – Some Down Time

2 Comments

The last two weeks didn’t show any progress on our site. We mostly let the concrete cure and harden to the point where it can handle framing construction on top of it. Our carpentry contractor has stopped by to remeasure and calculate how much material will be needed and we expect to be back up and running by next week. But besides that, we figured its a good time to come through and try to do something about the weeds that have taken over the yard!