Demo, demo, demo. It’s been a messy week of removing lath and plaster, storing wood trim, and dismantling doors and frames. The majority of the demo work left is the main level and we are starting to see the light at the end of the demo tunnel.
- Main Floor Bedroom 02
- Main floor bedroom 03
- Main floor back stairs to the basement
- View from the main floor kitchen into the living room.
- One big pile of wood lath. This is where all the wood from the main floor was stored before it was moved to the dumpster.