IT STARTED ON SAWYER

Adventures in Sustainable Renovations

Progress Week 08- The Demo Continues

Leave a comment

We were blessed with a break in the Chicago January weather. We are taking advantage of this January heat wave and getting as much work done as we can before the temperatures drop below freezing again. At Week 08 we have the basement fully demolished and 90% of the demo in the second floor unit complete. Why is it taking us so long to demo, you ask? Two words: selective demolition. We are carefully removing the plaster ceiling without damaging the structure; removing the lath and plaster on the walls without scratching the doors or trim; and repairing the brick work while minimizing the damage to the hardwood floors.

We have yet another full dumpster ready for sorting and processing by Ravenswood Disposal Services, Inc. RDS will pick up, sort and recycle our construction and demolition waste. They are able to divert any scrap wood, metal, paper, cardboard, gypsum, and stone products from landfill. We are working to salvage, donate, or restore as much as possible in the house, but not everything can be saved. Materials that are at the end of their useful product life are sent to RDS for processing. At the end of our project RDS will send us a formal report outlining the construction and demolition debris diverted from the landfill.

http://www.ravenswooddisposal.com/

Leave a comment